7E8FAF07-CC45-42C6-B84D-0309EC7C5BC4.jpeg
AA7E11E9-CE1F-4180-BA65-F514E9FDFBC6.jpeg
EE08554A-FA71-4780-B063-3AE74E18FDB6.jpeg
92874CF1-1FB0-416D-8B71-59B2C8446CA3.jpeg
AFA29084-D4AA-4C12-B962-F88CE854692F.jpeg
 
For those who have been waiting to see evidence of a bridge to come between QRC West 1 and 2 as I was, an ex-Allied type tells me that it was only going to be built if a tenant in the first phase was also going to lease space in phase two… and as that is not the case, no bridge across the laneway!

42
 

Back
Top