539e72e6-6bc8-4a42-a947-d4913317eb41.jpg
 
Application: Building Additions/Alterations Status: Not Started

Location: 10-20 BAY ST
TORONTO ON M5J 2R8

Ward 28: Toronto Centre-Rosedale

Application#: 13 216975 BLD 00 BA Accepted Date: Aug 7, 2013

Project: Multiple Unit Building Interior Alterations

Description: Interior alterations to the existing office building and creating an opening @ west side connected to 85 Harbour St, and interior alterations to the TTC entrances.Proposal also includes relocation of sprinkler heads.
 
A nice vantage point:

IMG_1644.jpg


IMG_1643.jpg
 

Attachments

  • IMG_1643.jpg
    IMG_1643.jpg
    91.4 KB · Views: 1,316
  • IMG_1644.jpg
    IMG_1644.jpg
    98.4 KB · Views: 1,336
Sept 19th

IMG_0064.jpg


IMG_0065.jpg


IMG_0066.jpg
 

Attachments

  • IMG_0064.jpg
    IMG_0064.jpg
    97.9 KB · Views: 889
  • IMG_0065.jpg
    IMG_0065.jpg
    97.5 KB · Views: 918
  • IMG_0066.jpg
    IMG_0066.jpg
    100.4 KB · Views: 939
The answer is "not soon enough". Let's hope that it is in next year's budget. I believe that creating a real neighbourhood hangout spot with a proper park there is critical for the success of this quickly transforming few blocks.

42
 
Before removing the ramp, the new offramp at Simcoe has to be ready and I don't think that all this this can be done next year.
 
How can the new ramp at simcoe be built without tearing down the existing ramp first? It is in the exact same spot as the current ramp..
 

Back
Top