Today.
BD035798-690D-46EA-BB2E-A168E8DF1AA0.jpeg
ABF28E95-915B-445F-945A-6F1672DE5971.jpeg
5E69D7DA-33C9-49C7-A473-10F3FF9EFDC7.jpeg
 
Does anyone know what they were doing in the turn pike south of this development?
They have drilled what looked like a 20m radius and 50+ ft deep hole in the ground which is now filled in.
There are Enbridge signs out front - I was thinking a deep Well like they did at "The Well" project to cool buildings in the area?

Any insight appreciated.
Screenshots of where I am referring to attached.
Also, any update on this becoming a park?
WHAT HAPPENS.JPG
what happens here.JPG
WHAT HAPPENS.JPGwhat happens here.JPG
 
From what I remember the work in that area is tied to an enbridge natural gas line. I think they are relocating/burying the one that runs over the Don river just west of there.

As for the park, I think that was scrapped and replaced with the park that is going to be facing queen at the north side of the development
 
If I had to hazard a guess, I'd say the hole is an extraction shaft for the TBM that'll take the gas line under the Don.
 
From what I remember the work in that area is tied to an enbridge natural gas line. I think they are relocating/burying the one that runs over the Don river just west of there.

As for the park, I think that was scrapped and replaced with the park that is going to be facing queen at the north side of the development
You are correct, it is/was the eastern side of the Don River Enbridge pipe-burying project. I think this is now just about done and that in the spring they will remove the pipe over the river (just north of the old and unused bridge.)
 

Back
Top