Friday afternoon:
20190622_115845.jpg
 
There's been a pause in finishing the facade on 2 sides of the building for a while. Any idea why the delay?
 
^Agreed, and to add to that developers can learn a whole boat load of things about designing rental buildings.

Ryerson should launch a program called "School of Architectural Design for Toronto Developers", and at minimum, half of Toronto developers should be required to enroll.
 

Back
Top