AlbertC
Superstar
Canadian Architect with some coverage on this building. It had a soft opening in May 2022 and is expected to be fully operational this autumn.
www.canadianarchitect.com
![www.canadianarchitect.com](https://cdnarchitect.s3.ca-central-1.amazonaws.com/2022/08/19133229/005-MSA-MTARCH-SheridanEDIT.jpg)
Sheridan Student Hub: Mississauga, Ontario
Located in Downtown Mississauga, the recently completed Sheridan College Hazel McCallion Campus Phase 2A (HMC2A) is a vibrant 70,000-sf addition to the Phase 2 academic building, designed to add a range of social aspects to the commuter campus and serve around 6,100 students. Designed by...
![www.canadianarchitect.com](https://s3-ca-central-1.amazonaws.com/cdnarchitect/2019/04/16134113/CA-rnd-icon.png)