I've seen some photos of a full-scale mock-up. Frame is composed of angled semi-transparent, orange glass capped by a light grey profile at the point which is kinda like a modified "c"-channel. Basically very similar to the images as rendered.
 
Yes, coloured panels of some sort are coming. Has nobody noticed that some things take a while to happen sometimes, and occur not on our schedules but on theirs?

42
And some things that are 'promised' never appear at all (or, with cranes!) never disappear. :->
 
...Literally just said this is happening. I've seen it.
You said you have seen some photos of a mock up, I am not saying this will not happen but there is often not much connection between renderings and mock ups and the final product.
 
I'll say this: there's more connection between renderings and final product than there is between impatient UrbanToronto members and final product. Sure, sometimes details like materials change, but if you're virtually selling the building by featuring striking window frames in the renderings, then you build them. You can swap out smaller elements and not have people notice, but not signature ones.

Besides, what do people think all these posts are for but to hold the fins in place?
fc580a2a-c3f8-4e41-99e0-9ea663d91280-jpeg.139060

Source: @ADRM

That is not the final look.

42
 
Yeah I think it's quite obvious that there are many pieces of facade missing. As 42 said, you can't just sweep such a striking feature under the carpet...and if they do it's still not to say that this is the final product.
 
It has been fun reading all these comments over the last 3 years. I don’t want you guys fighting so I will fill you guys in. The orange appliqué is coming. We erected the overhead protection for that reason. The outriggers are no longer being utilized as we had to make changes to the appliqué and the new design will not require it. The appliqué is still orange and we will start on King St and work our way around.
I want to thank you all for putting up with us for the last few years and wish you guys all the best and hope you enjoy the final result.
 
You said you have seen some photos of a mock up, I am not saying this will not happen but there is often not much connection between renderings and mock ups and the final product.

A mock up is the test of how something might happen. While this doesn't mean that it will happen, it's the method of seeing how it can happen.
 
A mock up is the test of how something might happen. While this doesn't mean that it will happen, it's the method of seeing how it can happen.
Exactly, sometimes a mock-up does not turn out as e3xpected and changes are made before the final product.
 
IMG_8435.JPG
IMG_8429.JPG
IMG_8432.JPG
IMG_8430.JPG
 

Attachments

  • IMG_8435.JPG
    IMG_8435.JPG
    237.8 KB · Views: 624
  • IMG_8429.JPG
    IMG_8429.JPG
    105 KB · Views: 623
  • IMG_8432.JPG
    IMG_8432.JPG
    240.7 KB · Views: 569
  • IMG_8430.JPG
    IMG_8430.JPG
    245.7 KB · Views: 549
Laneway is open.

IMG_8443.JPG
IMG_8444.JPG
IMG_8445.JPG
IMG_8446.JPG
 

Attachments

  • IMG_8443.JPG
    IMG_8443.JPG
    134.6 KB · Views: 576
  • IMG_8444.JPG
    IMG_8444.JPG
    127.5 KB · Views: 553
  • IMG_8445.JPG
    IMG_8445.JPG
    118.9 KB · Views: 608
  • IMG_8446.JPG
    IMG_8446.JPG
    138.5 KB · Views: 543
Looks very attractive. I wonder how long it will be before some pork head in an SUV rakes the wall with their bumper. They would be well advised to install or erect something to protect it. Something easy to replace.
 

Back
Top