It really as an achievement to go from such great renderings to such terribly execution. Toronto needs an award for worst building bait and switch.

The developer/architect combo is a dead giveaway that this will not be great. Renderings are for suckers in this town.

As to the name for this project - Anti-Social would surely have been more appropriate.

AoD
 
The developer/architect combo is a dead giveaway that this will not be great. Renderings are for suckers in this town.

As to the name for this project - Anti-Social would surely have been more appropriate.

AoD
Yes, the names of condo projects do tend to reveal the truth! (Think of Time & Space, Yonge & Rich,....)
 
As seen from Allan Gardens, today:

PXL_20220409_142613386.jpg


PXL_20220409_142613386~2.jpg


PXL_20220409_142623512.jpg
 
I'm sure it makes "sense" in some sort of value-engineering / profit-margin, bean-counting way.
 
Last edited:
Lol wow.
This gets asked a lot, and there's always a pedantic reasoning that follows, but I'm gonna ask it again. How can Toronto allow this?
 
Lol wow.
This gets asked a lot, and there's always a pedantic reasoning that follows, but I'm gonna ask it again. How can Toronto allow this?
Couldn't they see how horrible now and just take down all the cladding and replace them with better glass?
A darker quality glass in black or white color can save this project
 

Back
Top