Dundonald is now closed to both cars and pedestrians in front of the site. There’s a machine that looks like a pile driver, so I think they’re building the tunnel that will connect the subway access at Totem to the project. I remember they closed the same road slightly further east when Totem was under construction, and I thought that they were building the tunnel then (Clover was already a hole in the ground).