From today May 7th: 1) Concrete poured into the corners lower down 2)Centre core was raised up at the top 3)Work being done over the entrance off of Bloor St.
Not that Johnny, Bloorman, Vic or Benito need any help documenting this, but drove by this today for first time in a while and it’s even more spectacular in person. Got stuck at the intersection so said “what the hell” rolled down my sun roof and took these…lol.
I found them surveying for the sidewalk replacement (I think). The crane hoisted up what I believe, are very large expansion tanks. They seem to be too small to be hot water tanks.
Just two pics to contribute, taken May 8th, 2024 - from the Millwood Bridge: (The One is on the left, paired beside 1 Bloor East, while 11YV is right-centre. Adagio is almost dead centre.
Lots of work going on in the the lower mechanical level. Too bad I can't get a better They hauled up some sort of tank today but I'm not sure what it's for. It could be for storm water management, as per a photo I found on Hyland's website.