Photos taken today, Friday (Sept. 1). Since my last post a week ago, as seen in posts earlier today the east Rail Climbing System (RCS) has gone up one level, to install the 9th floor skin, though none of it yet has been placed. The north RCS seems to have all the cladding in place for the 8th floor, so that will presumably rise as well soon. Work at the top proceeds on the 2nd mechanical levels, floor 37 etc., and the super-column forms have risen one level, as have the corner hanger forms. Lots of netting added to the east side, with yellow nets attached to the RCS there, and others added above.

The photos: After my usual weekly "time-lapse" photo, views of the progress of the cladding and east RCS, including views of the NE and NW corners, with the new netting also shown. Then wide shots (and tighter shots) from the south, from in front of Holt Renfrew, and from Cumberland east of Bay.

My Flickr "time-lapse" album showing progress Oct 2020-Sep 2023: https://www.flickr.com/photos/jer1961/albums/72157718725607562



UTIMG_2154.jpg
UTIMG_2238.jpg
UTIMG_2497.jpg
UTIMG_2469.jpg
UTIMG_2476.jpg
UTIMG_2180.jpg
UTIMG_2525.jpg
UTIMG_2092.jpg
UTIMG_2125.jpg
UTIMG_2275.jpg
UTIMG_2321.jpg
UTIMG_2350.jpg
 
Last edited:

Back
Top