35FB1E6F-5249-47CF-80A9-8108490D74C3.jpeg
997B7562-8556-4A69-A03E-C882681C868A.jpeg
 
When they pour the pool base is it extra rebar? Thicker slab? How do they handle the weight of the water?
 
Looks like they're setting up to work on the 4th (?) floor of the main structure.
 

Back
Top