At the risk of being pedantic, I believe this is level 9. They're off their current pace of one pour per week (slab then walls) due perhaps to the new super column process, but still moving along nicely. :)
To my understanding, 8 was the last floor before they capped the Koalumn iron works. 9 is the floor where said Koalumns where capped. 10 currently is the floor above said Koalumns caps. And now they're building up the supports for 11...

...now this is not to say this is accurate, as I may have missed something on the way to the Koalusseum...but I am pretty sure the original iron works covered 8 floors including the podium. And I was counting from there. >.<
 
26FAA1A5-F2E4-4DCA-BA5C-6D0E322442A0.jpeg
8DC94D5A-D409-4E2B-B6CA-CB06EFCAB537.jpeg
07FD5AA2-C59D-45AC-8C57-9B4EE88F5898.jpeg
1F5EC296-37A3-4D54-BD61-04FA0BF0A6D0.jpeg
34501F8E-3719-4216-91C8-F9CDE2F0A489.jpeg
 
Here’s my count:
6 is the top of the retail podium/pool deck.
7 is the last level of the elevator podium, opens to the rooftop garden, and first level of hotel rooms (lower ceiling heights).
I believe we are now on the third level of hotel rooms…
...I guess I'll have to wait for @Contra to drop another of his vector diagram updates so I can count the floors properly. It's amazing how easy is for me to lose track of counting such. /sigh
 
They stopped pouring the condo elevator shaft walls after the sixth level, and have just been building decking in that area (for work space?). As tstormers posted above they will coming back to build out the core later. I read previously that they will be dropping in the elevators around levels 20/21.
So each floor in the centre core portion of the tower to this point is removeable decking which will continue up to levels 20/21?
 