First two pieces put up this afternoon, Tuesday (April 4). Seems to be two parts of a three-part section. A crate pictured below holds the three parts presumably for the mirror section on the east side, or maybe the nw corner which has the insulation already in place. Another crate shows multiple longer pieces, maybe for the centre panes on the level here and the fifth level, two to a section?

UTIMG_0164.jpg
UTIMG_0171.jpg
UTIMG_0186.jpg
UTIMG_0203.jpg
UTIMG_0211.jpg
UTIMG_0213.jpg
UTIMG_0234.jpg
UTIMG_0235.jpg
 
Last edited:
The older guy in brown seems to be a suit/engineer/owner supervising the first installation.
I bet they really hate having to do this with such public scrutiny right now. But they'll be crowing about the attention once they work out the bugs and this spectacle is nearing completion.
As a former denizen of Hogtown, I absolutely love watching all this from afar. (400 km)
 