Second pour. The first one was already done for the ground level deck.That's going to be a hell of a first pour.
well the blue base its for 1 crane the area its small and one can cover all that..
Second pour. The first one was already done for the ground level deck.
looks way to large size for a crane base...I think you meant the one with the "x" is the crane base. The blue base is for the concrete pump as mentioned above.![]()
Second pour. The first one was already done for the ground level deck.
looks way to large size for a crane base...