I noticed them laying electrical conduit a couple days ago but wasn't around yesterday to see if there was a concrete pour for level 57. Here are some pictures from today:

20240419_083448.jpg
20240419_111155.jpg
20240419_111203.jpg
20240419_111217.jpg
 
Photos taken today, Friday (Apr. 19). Not much movement at the top of the tower since my last post a week ago, but all of the black Rail Climbing Systems (RCSs) moved up at least one level. They seem to still be on level 57 at the top, some of the blue scaffolding on the east side now up where the rest were last week. And the corner blue forms are up one level as they are up around floor 48. The east RCS is now at level 21, the north RCS has jumped several floors from last week, also at 21, and the west RCS is up to level 20. (The mini black scaffolding next to the crane is still at 19.) So, a lot of shots of the RCSs and the emerging notched shape of the tower.

Starting with my usual Flickr "Time-lapse" album addition, the view from south on Yonge Street, then closer views of the first mechanical level and rising RCSs, beauty vertical shots of the east side, then more from Bloor at Yonge. The RCSs from the west on Bloor, in front of Holt Renfrew, and views from Cumberland east of Bay. And a final shot west from Bedford and Bloor.


UTIMG_2406.jpg
UTIMG_2655.jpg
UTIMG_2523.jpg
UTIMG_2556.jpg
UTIMG_2474.jpg
UTIMG_2495.jpg
UTIMG_2449.jpg
UTIMG_2437.jpg
UTIMG_2224b.jpg
UTIMG_2273.jpg
UTIMG_2305.jpg
UTIMG_2173.jpg
 
Is the building actually going to be that bright? Or it’s just highlighted for renderings, I can’t see anything that can cause such light on existing facade, or it’s going to be done later?
IMG_1514.jpeg
IMG_1515.jpeg
 

Back
Top