Tricolor air show that painted on sky looks Italian flag.. did it had happen today?
yes. It was amazing.Tricolor air show that painted on sky looks Italian flag.. did it had happen today?
Tricolor air show that painted on sky looks Italian flag.. did it had happen today?
That will be when they pour the slab for level 76 (or technically, when the columns or core for level 75 are poured) so about 12 weeks to go.I'm just looking forward to this surpassing 1BE in height
I thought somebody a while ago mentioned that some of the ceiling heights at The One are higher than 1BE's, which means that it should be taller than 1BE before Level 75/76? Then again to surpass 1BE, The One has to be taller than 1BE's roof (which adds another 2-3 levels above its 76 floors), so you may be right.That will be when they pour the slab for level 76 (or technically, when the columns or core for level 75 are poured) so about 12 weeks to go.
UT's database has One Bloor East with a height of 257.24 metres. The SPA drawings for The One (with the height increase) indicate this is between levels 75 and 76. The drawings I have were from Dec. 2020, so maybe it's changed on a resubmission - I haven't checked.I thought somebody a while ago mentioned that some of the ceiling heights at The One are higher than 1BE's, which means that it should be taller than 1BE before Level 75/76? Then again to surpass 1BE, The One has to be taller than 1BE's roof (which adds another 2-3 levels above its 76 floors), so you may be right.
Thanks. So the next and final mechanical levels will be just over 1 BE’s height.UT's database has One Bloor East with a height of 257.24 metres. The SPA drawings for The One (with the height increase) indicate this is between levels 75 and 76. The drawings I have were from Dec. 2020, so maybe it's changed on a resubmission - I haven't checked.
View attachment 585476
(source, City of Toronto AIC).
I think they poured the slab for 64. The blue forms are almost 3 floors tall, so this is what I get starting at the first mechanical level (of the third set).The top crane brace is secured to the floor of level 60, as per the markings on the wall. It's hard to say for sure if the last floor poured is 64 or 65. What does everyone think?