March 27
33627207938_f45dc2bb5f_b.jpg

33627169758_085a6c3f18_b.jpg

32561727367_9781fde616_b.jpg

33627171518_7fb5171609_b.jpg

47451100812_432917363d_b.jpg

47503880661_10819a10b6_b.jpg

40537889843_b7b75b8370_b.jpg

33627174528_3cb1975145_b.jpg

33627175698_80f3dace67_b.jpg

40537892833_f832124e45_b.jpg

46780178544_e63d9c6891_b.jpg

32561738707_d6b2bd75bc_b.jpg

47451106252_ffa89900b9_b.jpg
 
Too bad UT cheaped out and didn't put a wide angle Bloor/Yorkville time lapse camera in the right place place during this rather amazing transformation (joking Ed and my credit cards are maxed srry). Would love to see early 1 Bloor East through all the others underway all the way to at least 1 Bloor struggling to climb above grade lol.

Oh wait, I can call Koops and see a sketch... or maybe he's sick of my calls, wouldn't blame him. Did buy him a beer or two.
 
Minor Variance has been approved by the Committee of Adjustment:

To alter the mixed-use redevelopment scheme consisting of two buildings on a shared podium approved under Site Specific By-laws 1049-2015 and 1050-2015 by removing one level of residential parking in the above grade parking garage and reducing the mechanical penthouse in the north building in order to accommodate two additional residential floors. The buildings will be 44- and 68-storeys. The maximum permitted overall height for the north building (including the mechanical penthouse) will be maintained as 215.0 m.

 
Yorkville chaos - even partial view obstruction of the Four Seasons from the south will be sad. Everyone hates boxes but the 4 Seasons is pretty much as good as it gets in today's box market. Hope this project (a step or so east) won't do that. Bye bye lovely firehouse... least you can annoy them with sirens.
 

Back
Top