Photos taken October 29th, 2023:

DSC02723.jpg
DSC02725.jpg
DSC02726.jpg
 
It might still be gravel but why do you think it will remain like that?
Normally gravel is a base for your floor which means they still have the floor stop before most likely so they are still not done on the lowest level I believe. We will wait and see. Probably be February before they do that anyways
 
I believe they are building a concrete raft which would be independent of the bottom floor. Usually have to add services such as drainage. Soil conditions must be unstable and bedrock out of reach in the area.
 
While on route to Prada…..there was a big pour today where as One Yonge’s Sky Tower 1/3 transfer slab pour was a dud in comparison on Friday.
IMG_8287.jpeg


IMG_8292.jpeg


IMG_8293.jpeg


IMG_8294.jpeg


IMG_8295.jpeg


Edit. Added two more pictures. iCloud issues for the last month are driving me crazy.
IMG_8285.jpeg



IMG_8283.jpeg
 