A milestone day at The Well. Principal excavation for the Enwave cistern has been completed, and the remaining excavators are now being lifted out of the hole.
First photo shows more of a perspective, with several pieces of equipment already up on the staging area along the Wellington Street sidewalk. The second photo shows preparation for lift out of another excavator. The final is a bonus photo, showing relocation of the west stairwell down into the site, taking place concurrently with the equipment lifts - presumably so that it can be raised up a level as the lowest level basement in this area is being complete.
First photo shows more of a perspective, with several pieces of equipment already up on the staging area along the Wellington Street sidewalk. The second photo shows preparation for lift out of another excavator. The final is a bonus photo, showing relocation of the west stairwell down into the site, taking place concurrently with the equipment lifts - presumably so that it can be raised up a level as the lowest level basement in this area is being complete.
Last edited: