Stopped by March 28th to take a couple pictures. Not much difference on the outside, other than that for the south building, they have finished the cladding (?) for the parts that used to be the hoist elevator.

IMG_6947.JPG
IMG_6948.JPG
IMG_6949.JPG
IMG_6950.JPG
 
From April 18 - The construction crane is still coming down. Compared to the times taken by other sites to bring down their construction cranes, this one seems to be quite slow. Meanwhile, the landscaping preparation for the areas in front of the townhouse units is underway. boulevard area in front of the townhouse unit is underway.

1000004116.jpg


20240418_135526.jpg


1000004118.jpg


1000004119.jpg
 
May 15: A couple of notes. First, there is still a lot of work to do to enclose the openings in the north tower where the construction hoist used to be. The comparable openings in the south tower have been completely enclosed and sealed up. Secondly - a large crew working on the Widmar street frontage landscaping - looks like a bit of a push to get this component finished.

20240515_123651.jpg




20240515_124038.jpg


20240515_123936.jpg

20240515_123856.jpg


20240515_123946.jpg
 
Last edited:

Back
Top