Still do not have their permits in place for the new building here, though they are in process.

But one new permit has cropped up:

1667050532967.png
 
Construction commentary from Trinity:



UPDATES & CONSTRUCTION NOTICES​

  • Monday, December 19, 2022: Geothermal drilling begins. Rigs are in place to start drilling the 200-metre-deep boreholes. There are a total of 57 boreholes to be drilled, which equals 11 km worth of geothermal-exchange capacity.
  • Monday, December 5, 2022: Excess soil removal. Topsoil is being removed in preparation for geothermal drilling. Expect increased truck traffic and noise on site.
 
Construction progress pic from Jan 24, 2023:



01-24-trinity-20230124115810.jpg
 
A couple months later, and there isn't much to see; though, there is a little something different here..... on March 26th, 2023:

First, the promo material is up:

DSC01090.JPG


But then......well, this is different: the site is now divided into two, by a publicly accessible road of sorts by which you can get from Devonshire to Philosopher's Walk:

DSC01091.JPG


DSC01092.JPG


DSC01093.JPG


DSC01094.JPG


DSC01095.JPG
 

Back
Top