Can't wait to return to Toronto to take progress photos myself, but thanks for Katia Osokine for new pics of rearranged TTC access and Bay Concourse progress!

DGLEklvW0AAZ4Bq.jpg

DGLEkl0XUAA0HbR.jpg

(Source: https://twitter.com/KatiaOsokine/status/892491915790348288)

DGLE2OUXsAErxoC.jpg

(Source: https://twitter.com/KatiaOsokine/status/892492142085582850)
 
There are speakers that play the sounds of various bird predators, such as hawks. This has been an effective bird deterrent at Bathurst Station.

With the exception of the lady who feeds the pigeons every afternoon. But generally, yes, there are no birds in the station area. Likely the solution they will look to here.
 
TorontoUnion.ca has been re-designed and new maps have been added.
Some more details about the spaces at Union:

Street Level:
- West Wing:
A light-filled space to enjoy a Pilot coffee while you watch the ebb and flow of the city as you await your trip. Together with Union’s Founding Sponsor and exclusive Financial Services Partner, TD Bank Group, we will be bringing ongoing arts and cultural events, a platform for community building and surprises for commuters in this space.

- East Wing:
A beautiful room that continues the opulence and grandeur of the Great Hall. Strategically located at the heart of the financial district, this space will become home to a high-profile signature restaurant.

- Great Hall:
A major piece of Toronto’s heritage is being reinvigorated on Front Street. As restoration continues and in the tradition of the great train stations of Europe, visitors will be able to enjoy a meal on the newly created mezzanine level in coming years.

- GO York Concourse:
Connecting you to your daily commute, this space takes “grab and go” to a whole new level. With one of a kind store designs built to optimize serving time and big name cafés like Starbucks Express, Booster Juice and McCafé , there is no excuse for not having a great breakfast when you’re at Union. On your way home, don’t forget to pick up dessert at Uncle Tetsu’s Cheesecake.

- VIA Concourse:
Head down the ramp to board your train and await your VIA Rail experience. We’re revitalizing this busy area of the station to uncover beautiful historical accents and make your experience even more efficient.

- GO Bay Concourse:
The GO is doubling peak service and quadrupling off-peak service over the next ten years. This concourse will service commuters with even more options for “grab and go” meals to optimize travel journeys through Union.

Lower Level:
- TD Carriageway:
Home to an eclectic mix of food and shopping the TD Carriageway will be a bit of history brought to life.

- Front Street Promenade:
Heritage storefronts will be brought back to life here with a carefully curated collection of the best local and international independent retailers. Union’s new main street, pop by for a hair trim, a manicure, and delicious fresh baked goods.

- Bay St. Promenade & Retail:
Didn’t have time to get a gift for your colleague’s birthday? No problem! A click of heels on the polished floor and you have the satisfied feeling of a shopping spree well played. With the best in brand names to choose from, you’ll get everything on your list. And then some.

- York St. Promenade:
Choosing between crispy fried chicken and the siren call of a pasta bar is the toughest choice you’ll have to make in this corner of the station. Featuring casual eat-in restaurants, skip the rush on your way to the theatre or the game, and enjoy a great meal at Union.

- Food Court:
You’ll have the big names you’re familiar with, and you’ll be happy they’re here but, why not try the latest food court concepts from some of Toronto’s best-known chefs? Who? You’ll be excited to find out!

- Fresh Market:
Heading home and don’t know what to eat tonight? Thinly sliced charcuterie, farm-fresh veg, crispy baguette, and a bottle of Ontario pinot noir are begging to be brought home and served up.
 
Last edited:
- Fresh Market:
Heading home and don’t know what to eat tonight? Thinly sliced charcuterie, farm-fresh veg, crispy baguette, and a bottle of Ontario pinot noir are begging to be brought home and served up.

I might have missed this part of the work, but is this new "Fresh Market" already constructed?
 
Aug 8
Get your jumping shoes's out as the skylight glazing is on site.

A lot of the excess membrane has been cut and ready for the glazing. Not all the skylight framing is up, but can't see the area for all the creates. The west end moat area is ready for concrete.

The trough area has been seal and not sure what the centre items are that have been added since I last saw it.

Will post photos in the next day or so.

EDIT: PHOTO ADDED
Looking at the trough item, its the drainage system to removed the water when the trough is almost full for an odd reason and why is it not lower?

They are installing the water sprinkler system in the center
36058733280_33bea3b2c0_b.jpg

36058738030_2791a699a7_b.jpg

36287463412_464fb72bbb_b.jpg

36058740740_d69716c566_b.jpg

36058744760_8ca4ff56ff_b.jpg

36287470442_ff90690bca_b.jpg
 
Last edited:
Aug 8
Looking at the trough item, its the drainage system to removed the water when the trough is almost full for an odd reason and why is it not lower?

I think the hole is actually a lot lower (round thing visible in the pic) - the metal thing projecting out maybe some kind of support for grills above the trough to keep junk from falling in?

The line of "open holes" look like where they will be putting the columns in for the skylight.

AoD
 
I think the hole is actually a lot lower (round thing visible in the pic) - the metal thing projecting out maybe some kind of support for grills above the trough to keep junk from falling in?

AoD
Good guess, the 'things' seem to have screw holes on top of them too.

UPDATE. I walked over and 'inspected'. You are 100% right about the drains. There is a series of holes, every 10 yds or so, , in the trough and today they were fitting them with screens to catch the 'muck'. The metal projections look VERY like supports for a cover, we shall see - but it makes sense to me.
 
Last edited:
Cell phone shots from this evening
20170812_190055_resized.jpg
20170812_185424_resized.jpg
 

Attachments

  • 20170812_190055_resized.jpg
    20170812_190055_resized.jpg
    1.5 MB · Views: 484
  • 20170812_185424_resized.jpg
    20170812_185424_resized.jpg
    1.4 MB · Views: 477
Aug 8
Get your jumping shoes's out as the skylight glazing is on site.

A lot of the excess membrane has been cut and ready for the glazing. Not all the skylight framing is up, but can't see the area for all the creates. The west end moat area is ready for concrete.

The trough area has been seal and not sure what the centre items are that have been added since I last saw it.

Will post photos in the next day or so.

EDIT: PHOTO ADDED
Looking at the trough item, its the drainage system to removed the water when the trough is almost full for an odd reason and why is it not lower?

They are installing the water sprinkler system in the center
36058733280_33bea3b2c0_b.jpg

36058738030_2791a699a7_b.jpg

36287463412_464fb72bbb_b.jpg

36058740740_d69716c566_b.jpg

36058744760_8ca4ff56ff_b.jpg

36287470442_ff90690bca_b.jpg
I talked to one of the guys who will be doing the installation and he said they will be starting a week from this Monday.
 

Back
Top