How it started:

How it's going:



LOL @ closing for two years

And now they are predicting 8-10 year construction timeframe for Union Station Enhancement Project. Given their track record, I think it will take 20 years. Probably done by 2040.
 
If not for all the heritage protection, they could have imploded the station and rebuilt it in a fraction of the time.

Richard? Hyperbole? Nah........ never. LOL

If the first contractor had been more competent and the City exercised better oversight, such that the contractor needn't have been fired that would have shaved a year, at least.
If the second contractor hadn't gone bankrupt; doubtless a year or more could have been shaved off there.

The project was going to be a long one, no matter what.
Probably longer than planned, as there really were unforeseen complications; which is to be expected on a project of this scale and scope, involving a heritage building.

But it still should been finished at least 2, if not 3 or more years sooner than it was.......err....will be, when they actually get done this particular project.
 
The main issue as to why Union took so long was that not one, but two contractors happened to file bankruptcy during the project.

Unforeseen circumstances are inevitable in major infrastructure projects and should be expected. the construction timeline here became so comically long because the city had to retender the work two different times.
 
Here's some shots from 1974...

2.JPG
3.JPG
6.JPG
Scan10038 (2).JPG
 
oooh Laura Secord used to be just before the ramp to VIA? Had no idea they were in the station for so long.
If memory serves correctly, they were in the Bay concourse too, before the location became a Purdy's chocolates.
Wonder if they'll be back soon
 
Having been reminded of my childhood - here are some specifics from the early 60's.

There was a chalk board on the Arrivals level for arriving trains. Departures were shown on a board in the center carousel in the Great Hall. There was a fancy analog writing machine (the fancy name escapes me at the moment) between John Street and a couple of locations in the station to announce platforms etc - staff had to know where the machines were and check the paper roller for updates. PA system was anemic, echoed badly, virtually impossible to understand. The CN da-da-da-dah announcements came around 1970 when 8-tracks came in vogue - the announcements each had their own 8-track tape to be shoved in to the player as needed (it pains me to think how many readers are asking "what's an 8-track?")

The only "wayfinding" was at the gates - signage was as per the recently- restored pillars. Rollers inserted for each train as required (think bus/streetcar type destination rollers). The gates had a brass railing to funnel people past the gateman (they were all men). No walkie talkies back then, so a bit of a ritual so the gatekeeper knew when the train was ready to accept passengers. Gates were sliding glass with mesh, kept closed until ready to board.

Coffee shop (with counter service) was on the east side of thedepartures area at the north end. Other stores were where the seating areas are now - those areas were expanded circa 67 to provide more space. Later moved the main store to the far end of the departures area.

Pre-Rapido, premier trains used to depart from Track 1 which was the two gates on the ramp. That kept the biggest lines out of the lower concourse. CN moved the Track 1 entrance into the Great Hall (east of the ramp) after the Rapido was introduced. VIA moved it to the west side where it has been more recently (that was an arrivals portal previously). In the sleeping car era, there was always a desk by every gate where sleeping car passengers checked in.

Arrivals level was downstairs, the two passageways leading to arrivials was kept virtually "off limits" to the public. Or maybe I just got shooed out when I tried tosneak in to read the teletype thingy, there was one back there). Lots of brass railings to keep the greeters from the travellers.

In the busier era (ie WW2) old photos show the place shoulder to shoulder with people. I certainly recall queues but not crowds.

- Paul
(feeling younger every day)

PS - bilingual lettering added to the original (which was black) in the seventies.

View attachment 337997
That VILLE Lettering looks like the 1961 Helvetica Font CN was using from 1961 onward
 
It certainly looks 100% complete to me. I guess that's the new Toronto standard; as long as construction project is semi-functional and looks complete, then it should be considered complete. Dont worry about the boarded up areas, plastic wrapped mechanical stuff, and jackhammering.

Now that's a "world-class" standard!
 
It certainly looks 100% complete to me. I guess that's the new Toronto standard; as long as construction project is semi-functional and looks complete, then it should be considered complete. Dont worry about the boarded up areas, plastic wrapped mechanical stuff, and jackhammering.

Now that's a "world-class" standard!
I wonder why John Tory was in a rush to announce its completion. Anyone visiting Union Station knows it's not complete. Makes Tory look incompetent.
 
I wonder why John Tory was in a rush to announce its completion. Anyone visiting Union Station knows it's not complete. Makes Tory look incompetent.
As mentioned above Union Station will probably NEVER be complete! Metrolinx are about to start their decade-long project at the south end of the station and widening platforms etc and I bet it will be a while before Osmington manages to lease out all the space that is still vacant. (That said, the Great Hall floor and lighting and the painting of the "Front St Promenade" ceiling are unconnected to other projects and are in the City-owned part of the station and they are clearly unfinished!)
 