EnviroTO
Senior Member
They are two separate projects by different contractors. I would imagine that the engineers need to be able to sign off on the condition of the finished product and if there were wooden temporary stairs it would not meet engineering requirements. I'm not sure wooden stairs would last 2 to 3 years under then heavy traffic that those stairs see and even temporary stairs need some ability to direct water away from where it shouldn't be and provide load bearing support.