November 26th, 2017

DSC_7920.jpg
DSC_7921.jpg
 

Attachments

  • DSC_7920.jpg
    DSC_7920.jpg
    314.8 KB · Views: 617
  • DSC_7921.jpg
    DSC_7921.jpg
    179.8 KB · Views: 611
This photo was posted in another thread but it does set Encore in its context.

128533
 
Last edited:
Perfect thanks! The top floor amenity looks impressive. Hopefully the elevators (and elevator maintenance) will be good in this building.

There will be 5 elevators so I guess if one broke down there are still 4 others that will be running. Did you purchased a unit in this project?
 
The jib crane is sitting where the stand alone site is, to be place on the roof in Jan to bring the tower crane down.
 
Wood in the windows? I haven’t seen this done one previous levels.. wonder if the glass shipment is delayed or something.
 

Back
Top