drum118
Superstar
The trees in the centre of the road will be history as well one lane in each direction. 6 lanes reduce to 4 lanes.
The current ROW for the road is for 9 lanes of traffic and one reason for the far setback that exist today north of Cooksville GO Station.
Nothing is going to happen where the existing sidewalk is now and have to wait until 2013 to see any construction engineering drawings for this area. The Nov Open House for the LRT is to be cancel since the percentage of completed drawings are not near the 30% mark, as well other changes that have surface in the last few months need to be address.
The current ROW for the road is for 9 lanes of traffic and one reason for the far setback that exist today north of Cooksville GO Station.
Nothing is going to happen where the existing sidewalk is now and have to wait until 2013 to see any construction engineering drawings for this area. The Nov Open House for the LRT is to be cancel since the percentage of completed drawings are not near the 30% mark, as well other changes that have surface in the last few months need to be address.