TJ O'Pootertoot
Senior Member
I feel like DRL long should be a top priority over this extension, which is not something we really need at the moment.
Just because we need DRL long doesn't mean "we" (as a region, trying to promote suburban, transit-oriented intensification) don't "really need" this extension. The fact that Toronto has neglected to build adequate infrastructure for a generation doesn't negate the existence of other needs.
I was on Yonge, north of Steeles yesterday and from that single point, simply craning my head 360 degrees (not all at once!), I could see 8 buses on the road. Often at Steeles I can see 12 or more, all within sight, all on a corridor for which massive intensification is envisioned and desirable. Waiting 20 years to build the YNSE won't mean fewer people getting on the subway at Finch, it will just mean I'll see 20 buses at once instead (and more pedestrians with asthma, probably). You can try to choke off the development by withholding public transit, I guess, but I don't know how far it will get you. This is the great fallacy of the "we can't build the extension" (or, worse, the "we don't need the extension") argument.
It's funny how everyone now insists we need DRL Long, an idea that only exists because the oft-derided Metrolinx decided to study the entire, holistic problem of congestion/relief on the Yonge line while Toronto City Council was busy changing its mind 20X on Transit City and/or the Scarborugh Subway over the course of 10 years during which even the DRL Short was a backburner project, only simmering on the stove at all because everyone realized the YNSE -which "we" do "need" would push Line 1 to its capacity breaking point. The ironies abound.
In the meantime 5-minute frequencies are almost certainly impossible on the RH GO line which is already at the bottom of the RER list due to the track ownership and flooding issues. Two-way, all-day GO is needed too but as a relief solution, it's been a red herring since the first time someone proposed it on this thread, probably on Page 1.
Build the YNSE, build the DRL as long as you can. Find the money, Do them both soon.
EDIT: And yeah, as just posted, there's the $9B + both Ford and Wynne (FWIW!) have committed to build it. Horwath...we'll see. So, the funding is largely explicitly committed already though, sure, things change.