Edmcowboy11
Senior Member
LRT future appears to be safe!!!
Yeah. No idea on their estimates. I'm assuming the signal issues and other problems compounded the failure. It was a bad extension. Hopefully can be salvaged by elevating the current mess areas and extending to NW.@thommyjo
You explained why ridership did not increase with the NAIT line and that makes good sense. But why then did the city expect it would increase by 2.5 million trips - did they not expect the same thing that you just explained. These projects are being pitched and decided upon based in part on ridership but the city did not seem to take into account what you explained as to why we shouldn't have expected ridership to go up.
Any thoughts on my other question regarding the BRT cost from the city for west valley line? Or any insights from anyone on that?
Why was the cost of BRT going to be so much higher in Edmonton versus other municipalities that have built BRTs?
I mean $1.7B for 14km of BRT? I looked at costs of several other cities including Calgary and none come close to what our administration reported it would cost here.
The one thing i remember from the BRT vs LRT cost comparison was the need to build a dedicated ROW. BRT needs to be separate from heavy traffic (ie the whole of the west leg, basically) so, even if they were to use busses instead of trains, infrastructure akin to a street-level line would have to be built. dedicated, protected lanes, special signals, stations, and possibly even grade separation at points. they'd need one lane each direction, the same footprint as the train. I'm going off memories of articles written at the time, sorry i can't be more specific. but i do strongly remember that the issue was with this particular route, BRT would need almost all of the same infrastructure the train would need, and given other issues (capacity, operating costs) the train was considered a better plan.Yeah. No idea on their estimates. I'm assuming the signal issues and other problems compounded the failure. It was a bad extension. Hopefully can be salvaged by elevating the current mess areas and extending to NW.
I remain hopefully on the new lines. So thankful we have dense university institutions in our core.
Also no idea on BRT costs sorry. I'm assuming buying new busses, similar station designs to the current, etc make up most of the cost. Not clear on the difference vs other cities though.
For me, even if BRT was 300mil, it's still not the right transit option for this area. Rail is needed
Given how much of the windows on the LRVs are visible above the side of the guideway, I'm very confident that the views from the train will be absolutely spectacular!Taken this morning
October 20, 2021
There were around 3 or 4 trains parked or moving in and out of the station this morning.
View attachment 356888View attachment 356889
I wish those power lines could have been buried as part of this project.View attachment 357184More LRT at Davies