CplKlinger
Senior Member
They've already started with utility works from the looks of it, there's been stretches of road at/around 102 Ave blocked off for periods of time while they do underground work. Hopefully we see some above-ground stuff soon!I'm not sure how much quicker Marigold is. I'm STILL waiting for LRT construction from east of that bridge to downtown.