There has been a delay getting the last few floors enclosed. Word is that the windows weren't sized right for these floors that have extra height ceilings. If you look closely you can see extra small sections of spandrel (and glass?) above what looks like regular sized spandrel and glass on that topmost floor that is getting enclosed. So I wonder if they just went with what they had and added clerestory sections.


Nov.18 '16, my pics




 
December 16, 2016

20161216_122516.jpg
 

Attachments

  • 20161216_122516.jpg
    20161216_122516.jpg
    495.1 KB · Views: 303
January 2nd update:

20170102_132913.jpg
20170102_133320.jpg
 

Attachments

  • 20170102_132913.jpg
    20170102_132913.jpg
    356.4 KB · Views: 309
  • 20170102_133320.jpg
    20170102_133320.jpg
    311.1 KB · Views: 299
June 16th:

P1090402.JPG
P1090403.JPG
P1090404.JPG
P1090405.JPG
P1090406.JPG
P1090407.JPG
 

Attachments

  • P1090402.JPG
    P1090402.JPG
    462.5 KB · Views: 291
  • P1090403.JPG
    P1090403.JPG
    469.5 KB · Views: 275
  • P1090404.JPG
    P1090404.JPG
    812.6 KB · Views: 297
  • P1090405.JPG
    P1090405.JPG
    491.6 KB · Views: 290
  • P1090406.JPG
    P1090406.JPG
    848.1 KB · Views: 276
  • P1090407.JPG
    P1090407.JPG
    497.4 KB · Views: 279

Back
Top