First leg of this extension is set for construction shortly and operation in 2025 (not bad timing for a 5.7km extension that's mainly tunneled (5km).
 
It's to bad that it doesn't continue down to the University. For students, they can get halfway on the subway and then have to make a transfer to continue the rest of the way. I may be wrong but I believe that connection isn't on the books for any time soon either.
 
It's to bad that it doesn't continue down to the University. For students, they can get halfway on the subway and then have to make a transfer to continue the rest of the way. I may be wrong but I believe that connection isn't on the books for any time soon either.

Its being studied.............though it hasn't been funded yet.

 