Previous Discussion on SSP

Project Website

Location: 11 Laurier St.

Project Description:

Portage III renewal project​


This project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life.


The project includes:


  • replacing base building systems, such as:
    • windows
    • the building exterior (also known as the building envelope)
    • plumbing
    • electrical systems
    • heating and cooling systems
  • modernizing the interior workplace
  • updating security systems
  • installing new information technology

Phases of project​


The Portage III Asset and Workplace Renewal (AWR) Project is divided into two phases and will consist of renovations to the inside and the outside of the building.


Phase 1 (2018 to 2027) is currently underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and base building systems throughout the complex by 2027.


Phase 2 (2024 to 2027) will address the interior workplace refit of the eastern towers (A1, A2, B1, B2 and E).

Renderings:

portage-img1.jpg
portage-img2.jpg
portage-img3.jpg
portage-img4.jpg
portage-img5.jpg
portage-img8.jpg
 
Last edited:
It's going to make such a difference on the river views having those look like modern, glassy buildings instead of concrete hulks
 
Crazy that the redevelopment of both of these huge complexes is happening at the same time. You would think they could've tackled one before starting the other, but oh well... Hopefully they can convince workers to actually go in the office once these are ready ;) haha
 