hoggytime Active Member Staff member Member Bio Joined Dec 7, 2023 Messages 695 Reaction score 347 May 3, 2024 #47 This morning:
J.OT13 Active Member Staff member Member Bio Joined Dec 21, 2023 Messages 407 Reaction score 86 May 3, 2024 #48 You got close there! Great shot.
D Dzingle Bells New Member Member Bio Joined Aug 12, 2021 Messages 52 Reaction score 43 May 3, 2024 #49 Hah! looks like the guy in the middle saw you!
hoggytime Active Member Staff member Member Bio Joined Dec 7, 2023 Messages 695 Reaction score 347 May 3, 2024 #50 I didn't notice that! Amazing! Edit: I also just noticed the stupendous views of the Gatineau Hills this building will have.
I didn't notice that! Amazing! Edit: I also just noticed the stupendous views of the Gatineau Hills this building will have.
hoggytime Active Member Staff member Member Bio Joined Dec 7, 2023 Messages 695 Reaction score 347 May 7, 2024 #51 I got some really cool updates right from the developer today. 'total height will be 115m (377ft).' 'Phase 1 (under construction) includes tower "LUX-U" (standard units) and "LUX-PLUS" (all inclusive, fully furnished units)' 'Phase 2 will include towers "LUX-L" (25 storeys) and "LUX-X" (27 storeys)' 'We have some LED strips planned around the building' 'For Tower U (highest tower), there will also be LED strips (black dotted line) :' 'From the 26th floor to the roof' 'Our plan is to start construction of Phase II as soon as possible to be able to have our first tenants moving-in around 2028'
I got some really cool updates right from the developer today. 'total height will be 115m (377ft).' 'Phase 1 (under construction) includes tower "LUX-U" (standard units) and "LUX-PLUS" (all inclusive, fully furnished units)' 'Phase 2 will include towers "LUX-L" (25 storeys) and "LUX-X" (27 storeys)' 'We have some LED strips planned around the building' 'For Tower U (highest tower), there will also be LED strips (black dotted line) :' 'From the 26th floor to the roof' 'Our plan is to start construction of Phase II as soon as possible to be able to have our first tenants moving-in around 2028'
P pgagnon Active Member Member Bio Joined Dec 13, 2023 Messages 101 Reaction score 24 May 8, 2024 #52 Happy to hear about the lighting. Again, more towers in Ottawa need some of these features. Also interesting that both the 27st and 25st will be built together as part of phase 2.
Happy to hear about the lighting. Again, more towers in Ottawa need some of these features. Also interesting that both the 27st and 25st will be built together as part of phase 2.