I got some really cool updates right from the developer today.

'total height will be 115m (377ft).'

'Phase 1 (under construction) includes tower "LUX-U" (standard units) and "LUX-PLUS" (all inclusive, fully furnished units)'

'Phase 2 will include towers "LUX-L" (25 storeys) and "LUX-X" (27 storeys)'

'We have some LED strips planned around the building'
1000025380.png


'For Tower U (highest tower), there will also be LED strips (black dotted line) :'

'From the 26th floor to the roof'

1000025379.png

'Our plan is to start construction of Phase II as soon as possible to be able to have our first tenants moving-in around 2028'
 
Happy to hear about the lighting. Again, more towers in Ottawa need some of these features. Also interesting that both the 27st and 25st will be built together as part of phase 2.
 