News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.6K     0 
20200306_171304.jpg
20200306_171539.jpg
20200306_171554.jpg
20200306_171611.jpg
20200306_171616.jpg
20200306_171619.jpg
20200306_171628.jpg

Some shots I took today, doesn't look too bad and has a decent coverage (for maybe 10-15 people at most)
 
They really should have the roof extend all the way over the tracks to the other side to properly protect waiting passengers from rain/snow etc. It's just as disappointing that it doesn't extend the entire length of the platform either. Do we really only get 2-3 of these per side? This reeks of 'absolute minimum".
 
They really should have the roof extend all the way over the tracks to the other side to properly protect waiting passengers from rain/snow etc. It's just as disappointing that it doesn't extend the entire length of the platform either. Do we really only get 2-3 of these per side? This reeks of 'absolute minimum".

It couldn't extend over the LRT because of the over head wires. And we really would need only 2 or 3 of these. Not everything needs to be state-of-the-art
 
Last edited:
It couldn't extend over the LRT because of the over head wires.

It could easily be built over the wires.

And we really would need only 2 or 3 of these. Not everything needs to be start-of-the-art

I'd hardly call platform length shelters state-of-art. That's reserved for things like platform edge doors.
 
Interesting. Seems a bit on the grey side. Back in like 2010 I remember the Prov/Metrolinx cutting the art component for Crosstown (I believe to appease the cut the gravy mantra after Ford 1.0 won). I guess after all these years they didn't bring them back. A bit of a shame.
 

Back
Top