kotsy
Senior Member
Back on topic here…
When that’s done I think it’s ready for asphalt.
There's a waterproofing layer that needs to go in before the asphalt. I confused it with asphalt during the first two lane rebuild because it was black or very dark, so it looked the same from the distant drone shots.
I expect everything to be wrapped up for the middle two lanes in the next 2-3 weeks.




