denfromoakvillemilton
Senior Member
Thanks for posting these.
They just keep making this project better and better. My two biggest beefs with the central section of the line have been resolved. Not very much that I would change now from Mount Dennis to Don Mills (other than actually taking into account the DRL in the layout of Don Mills Station).
Now if they can focus on doing something about the eastern section of the line, especially considering that the Auditor General's report on the Metrolinx MOU concluded that they agreed that at-grade portions of the line would affect the reliability of the entire line, and thus the line should be separated from traffic.
I still think there's time to float the idea of the City paying the cost difference and elevating the east portion of the line through the Golden Mile, especially if that means they can run the ECLRT and the SLRT as a single thru-line.
They are actually trying to make this work. I wish the connection to the airport was being built now.




