News   GLOBAL  |  Apr 02, 2020
 8.5K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. B

    GO studies Bolton rail service

    I suppose I do see the appeal of Alliston, but I’m inclined to think a more likely extension beyond Bolton would be a greenfield line to Orangeville.
  2. B

    VIA Rail

    On that wish list note, my big one is airline style lie flat pods. I really see it as more marketable here than the alternative budget sleeper options.
  3. B

    Scarborough RT Conversion To Park

    Honestly? Now that we've committed to the form that the SSE has, and and least expressed an explicit attempt for a Sheppard Subway that stays on Sheppard.... I don't know if the corridor DOES have a lot of value left.
  4. B

    Barrie Collingwood Railway (BCRY)

    I'll say that since I was involved in that Ryerson look at Collingwood passenger rail the emergence of ride sharing, especially if linked to the Innisfil model has done a lot to make the last mile seem less of a hurdle on the tourist side of things.
  5. B

    Roads: GTA West Corridor—Highway 413

    My understanding is that these things are closely related - the idea of recommending Milton had a lot to do with avoiding a new escarpment crossing. I don't like this project, or want it to go ahead... but between the current version and a direct Guelph one ploughing straight through the most...
  6. B

    Roads: GTA West Corridor—Highway 413

    Methinks this has a horrifyingly high likelihood of being prophetic on the level of grumbling about a "Newmarket stub" when Sheppard opened predicting Viva Yellow... Which would be consistent with the lot of them being heavily invested in real estate.
  7. B

    GO Transit: Service thread (including extensions)

    For my part this may not be a wholly terrible thing. My suggestion is really that this corridor is almost uniquely suitable to Tram-Train operation assuming Hespeler Road light rail is built... No, that Galt link won't be fast, but it will have far better connectivity than rebuilding Fergus...
  8. B

    GO Transit: Service thread (including extensions)

    Sure, lets forever slam the door on a proper connection to Guelph because Paul Langan thinks Toronto is the only destination in the universe and no one seems to be noticing how extraordinarily good the cost benefit ratio is on the lower end versions of this. Whether you like the shuttle or not...
  9. B

    GO Transit: Corridor Studies

    That last one does feel like it could have had some things going for it if it had been positioned as an alternative to ION.
  10. B

    GO Transit: Service thread (including extensions)

    I really don't see the appeal of these proposals in that they are going to be really very costly and do a lot less for Niagara Falls in general than an LRT. These would all upgrade GO, at significatn expense while quite possibly hurting cross border passenger service... While most LRT alignments...
  11. B

    Barrie Collingwood Railway (BCRY)

    Almost certainly... BUT: If costs on the low end of light modern streetcar can be assured there might just be something to this if extended downtown on a private ROW parallel to Lakeshore; and This is the kind of query that can lead to more sensible proposals getting political attention if...
  12. B

    TTC: Jane (LRT) RapidTO

    I’d suggest it’s the second part of this, rather than volume that really matters. It’s not about whether the volume is roughly equivalent, but whether that demand is meaningfully split at Eglinton. My suspicion is that, with a GO, Eglinton LRT and possibly OL connection at Mount Pleasant the...
  13. B

    TTC: Jane (LRT) RapidTO

    I’ve come to the conclusion that if it comes back we shouldn’t be looking at light rail south of Eglinton, quite possibly divert the LRT over to Mount Dennis, with the intent of something metro like, be it standalone or an OL branch, south of Eglinton where the tunneling is needed.
  14. B

    Mississauga Toronto | Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    Meh; If it doesn't get connected to a 407(ish) busway I see a very real possibility that it ends up in a SRT like situation where the problem is a lot less the actual technology than the politics and perception of the transfers that come with it.
  15. B

    Mississauga Toronto | Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    I mean it’s true in both cases… it’s just that that only really means that the corridor geometry will accommodate rail.

Back
Top