News   GLOBAL  |  Apr 02, 2020
 5.5K     0 
News   GLOBAL  |  Apr 01, 2020
 26K     0 
News   GLOBAL  |  Apr 01, 2020
 2.6K     0 

  1. Coruscanti Cognoscente

    TTC: Bloor Danforth Line 2 West Extension(s)

    Milton line doesn't hit Square One unless you dig a huge ass tunnel to get there.
  2. Coruscanti Cognoscente

    Hurontario LRT | Metrolinx

    Ok so Brampton deserves a third hospital when larger Mississauga only has 2?
  3. Coruscanti Cognoscente

    2022 Transportation Master Plan (TMP) - York Region

    I get that. But why not revert to the original names from before it became Highway 7? Bovaird and Queen St in Brampton are no longer called Highway 7.
  4. Coruscanti Cognoscente

    2022 Transportation Master Plan (TMP) - York Region

    I’m talking about the western part between Kipling and Islington.
  5. Coruscanti Cognoscente

    2022 Transportation Master Plan (TMP) - York Region

    Has there ever been discussion of connecting the western parts of Langstaff after they connect the center and eastern parts over the CN rail yard? Also, shouldn’t parts of Highway 7 be renamed Langstaff and 14th/Centre Rd and reconnected as appropriate or has that never been considered? Just...
  6. Coruscanti Cognoscente

    TTC/Metrolinx: Scarborough Subway Extension

    Why are they using purple in their marketing for this? shouldn't it be green?
  7. Coruscanti Cognoscente

    Toronto | Crosstown LRT | ?m | ?s

    Seeing the map of the Eglinton line with a station simply designated "Eglinton" really highlights the stupidity of leaving that name the same. It boggles my mind that they want to change Eglinton West, but not Eglinton itself.
  8. Coruscanti Cognoscente

    Toronto | Crosstown LRT | ?m | ?s

    Well that's why the method of using the names of the cross-streets works well, there's no ambiguity as to where the station is.
  9. Coruscanti Cognoscente

    Toronto | Crosstown Line 5 West Extension | ?m | ?s | Metrolinx

    I hate the new way they’re naming stops. I really prefer just naming them after the two cross-streets. The streets are (mostly) on a grid so it would be quite helpful to know where you are.
  10. Coruscanti Cognoscente

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    I’m not sure what you mean? I find it quicker to go up Jarvis than Yonge. Lots of pedestrians and slow moving vehicles on Yonge
  11. Coruscanti Cognoscente

    Roads: Fantasy Proposals

    Even the Toronto Rathburn and Mississauga Rathburn never got a bridge to connect them.
  12. Coruscanti Cognoscente

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Which is annoying. I always try to avoid Yonge because it moves so slow
  13. Coruscanti Cognoscente

    Hurontario LRT | Metrolinx

    It’s Mineola actually. I grew up in Mineola West. It’s a great area. It’s an oasis surrounded by the QEW to the north with Cooksville and Square One beyond, and very close to Port Credit just south of the tracks. With the multi million dollar homes in the area, I don’t see that changing.
  14. Coruscanti Cognoscente

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    I didn’t realize they are closing the Jarvis off-ramp. That’ll be inconvenient for getting to the Village.
  15. Coruscanti Cognoscente

    Roads: Ontario/GTA Highways Discussion

    Gotta say I really dislike this plan. It's just not intuitive. If you're going to build a new east-west arterial in that part of Brampton on a similar alignment to Major Mackenzie, why not just extend Major Mackenzie, and have Coleraine realigned to meet it slightly further west? Or you could...

Top