News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.2K     0 

  1. dkazzed

    LRT Safety

    Some crossings like 99 St at 102 Ave are terrible, easily wait 3 minutes there. The pedestrian crossings at Strathearn aren't bad, but they still invite the temptation of non-compliance.
  2. dkazzed

    Arc Smart Fare System

    I'm shocked they went with Arc card fares and fare capping. They could have opted to go with cash fares for revenue generation with occasional riders but retained the same fare capping for frequent riders, but they chose to go with the full Arc card experience. I wonder if there is reduced...
  3. dkazzed

    ETS Bus and General Transit Improvements

    Tapping debit/credit on most transit systems is the same as cash fare. But Edmonton made the best decision of going to fare capping rather than paying up front and loading monthly passes, so they could surprise us in a good way (or bad way and tack on a $1.25 convenience fee)
  4. dkazzed

    ETS Bus and General Transit Improvements

    Interesting that aside from Bow Valley, York Transit, and GO Transit, everyone is down Sep 25 compared to Sep 24, and half are down Year to Sept 25 vs Year to Sept 24 (Edmonton is up)
  5. dkazzed

    O-day’min Park (formerly Warehouse Park)

    We had a playground meet yesterday.
  6. dkazzed

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    One of the 2nd anniversary news clips said that motor vehicle - Valley Line LRV collisions are down significantly in 2025 compared to 2024. So it's trending in the right direction. I think more of the light up no right turn signs with the word "TRAIN" may help. I can only think of two locations...
  7. dkazzed

    Yellowhead Trail Upgrades

    No left turns from YHT to 66 St (EB to NB) starting Friday. Not sure if temporary or permanent.
  8. dkazzed

    Yellowhead Trail Upgrades

    It's part of the YHT active transportation corridor which runs largely on the south side of YHT from 142 St to 50 St, except for the short section between Fort Road where it crosses over to the north side of YHT via 125 Ave. If they don't want to build the 66 St connection at this time (missing...
  9. dkazzed

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    104 Ave is already shaping up towards something amazing from my viewpoint. Compared to last April: And 2019:
  10. dkazzed

    High Level Bridge

    Perhaps worth exploring alternative project delivery methods like Hinge and Bumble.
  11. dkazzed

    Transportation Safety and Vision Zero

    I take the entire lane at 30 km/h in the playground zone near my home. On occasion, like yesterday, I see the scoreboard speed monitor flash 35, 40 before abruptly dropping back down to 28-30.
  12. dkazzed

    106st-107st streetscaping

    Towards 40 projects are typically in areas with high number of concerns from area residents for pedestrian safety due to low safety compliance by drivers. While they've normally been completed on collectors roads, this is the first one done on an arterial road. While most bike lane and traffic...
  13. dkazzed

    Cycling and Active Transportation in Edmonton

    I love that they protected it northbound, but cyclists will still be closely tailed southbound by drivers who don't care that there's a whole arterial a block west.
  14. dkazzed

    Cycling and Active Transportation in Edmonton

    Cyclists are expected to ride backwards crossing the Ice District parkade entrance.

Back
Top