At the very most, I could see the 427 going up to the Bradford Bypass- that would give you an alternate to the 400 so it isn't a single point of failure, at least up to here.
Problem is the 427 interchange at the 413 is designed to be a 3-way, same with the connector for the Bradford Bypass and...