News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.3K     0 

  1. I

    Highway 401 Transit and Auto Tunnel

    Surprised nobody has posted this here yet. WSP takes the cake. https://www.cbc.ca/news/canada/toronto/doug-ford-highway-401-tunnel-study-cost-9.6969989
  2. I

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Looking at Google Maps in the middle of the day, to drive the full length of the Eglinton LRT is about 52 minutes while a bus straight across Eglinton (not the preferred route, which would be taking Line 2) would take 1 hour 29 minutes. 60% faster than driving would be 33 minutes, 60% faster...
  3. I

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Typical Google Traffic does indicate some issues weekday afternoons heading eastbound.
  4. I

    Toronto Toronto | Rogers Stadium at Downsview | ?m | ?s | Live Nation

    There's actually an entrance off Jane Street which is about 330 metres south of the 407 Station parking lot driveway. So hardly 10 minutes away.
  5. I

    Roads: Ontario/GTA Highways Discussion

    Yeah I actually got an email offering me the promo. I've used 407 maybe 5 times in the last 10 years.
  6. I

    Dundas St Rapid Transit (Metrolinx, Mississauga, Halton Region, CoT)

    Halton is mostly just going to have curb lanes repainted.
  7. I

    Finch West Line 6 LRT

    They all seem to work for me.
  8. I

    TTC: Other Items (catch all)

    Queue jump lane is open and operational. Nice to see this little improvement near my home.
  9. I

    Markham Toronto | YTO14 Data Centre | 27.9m | 3s | Microsoft | WZMH

    There's been pretty active construction going on for at least a few weeks. Excavators, dump trucks coming in and out, etc. Not much to photograph though, and it's a huge site.
  10. I

    Roads: Traffic Signals

    Great, another set of useless too-closely-spaced set of traffic signals.
  11. I

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    From the news release: https://news.ontario.ca/en/release/1004859/ontario-accelerating-construction-on-the-gardiner-expressway-by-at-least-one-year I'm pretty curious to see the details of these modifications.
  12. I

    Toronto Bike Share

    Thanks a lot, sounds like there's still hope for this year!
  13. I

    Toronto Bike Share

    I've been waiting for a station to open up closer to me since moving into the area. Looking at the 4-Year Growth Plan published in September 2022, a few stations nearby are indicated for opening in 2024. Does anyone know how closely Bike Share follows its growth plan? Are stations opened up all...
  14. I

    Toronto Toronto | One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    Wow, this thing is really going to stand out!
  15. I

    Toronto Toronto | 50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners

    I guess the units will have windows on both sides? That's going to make for a cool living space, although a bit exposed.

Back
Top