News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. I

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Would be really nice to see something like this displayed https://laughingsquid.com/anamorphic-digital-waves-inside-of-glass-box/
  2. I

    E Condos (Bazis, Metropia, RioCan) - Real Estate -

    You can ask Property Management to swap the lines. They did it for mine about a month ago.
  3. I

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Beautiful. What exposure and time of night?
  4. I

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    I have the same experience. Bars were installed on mine and the higher frequency sounds were muffled which is much better but the overall volume was about the same. Maybe if all balconies were done but I'm skeptical that installing those braces really fixes the whole problem. Does anyone know...
  5. I

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    My question is when did the sound start? Did it get louder as each floor was installed with the balconies? The workers would know. Or did the sound get really loud when something else in the building got finished like the roof, vents, shafts? Without knowing the root cause it's hard to say...
  6. I

    E Condos (Bazis, Metropia, RioCan) - Real Estate -

    In case anyone wants detailed measurements of the 1B+D. I took these yesterday but do your own if you want exact numbers.
  7. I

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Is there a 13th elevator floor? For example is suite 14xx on the 13th floor or 14th floor?
  8. I

    Toronto Toronto | Minto Midtown | 160.01m | 52s | Minto Group | Zeidler

    Can I ask what was your original possession date? Just wondering if all other dates have moved after that date.
  9. I

    Toronto Toronto | Minto Midtown | 160.01m | 52s | Minto Group | Zeidler

    Nope, but I did try to peek through the door slit. A big room but I didn't see much.
  10. I

    Toronto Toronto | Minto Midtown | 160.01m | 52s | Minto Group | Zeidler

    Ooops. Obviously I gave the thumbnail size image in my last post. Here are the larger images.
  11. I

    Toronto Toronto | Minto Midtown | 160.01m | 52s | Minto Group | Zeidler

    Actually, I took pictures of the South lobby last week. Here they are (excuse me, I hope these pictures turn out...my first time posting images).
  12. I

    Toronto Toronto | Minto Midtown | 160.01m | 52s | Minto Group | Zeidler

    I visited the presentation center last week and they confirmed that the closing dates are on schedule (slightly ahead). Looking like mid-to-end of Oct'08 for about the 20th floor occupancy date. This is just an estimate.

Back
Top