    2475 Regina St | 7/16/28f | 24/50/88m | Windmill | Diamond Schmitt Architects | Approved

    Looking at the site plan it looks like new Parkway house (7 sty.) and the 16 story will be built in phase 1. Once completed then new Parkway can be occupied and old Parkway house demolished. Then phase 2, 28 story can proceed.
  2. M

    Alto High Speed Rail

    The Minister of Finance's spouse is VP at Alto. Just another reason why this project stinks. Now it stinks of corruption. At the Ethics committee a motion was brought forward to have the Ethics commissioner, Minister of Finance and CEO of Alto testify before committee on this. The Liberals are...
  3. M

    Alto High Speed Rail

    Interesting video by B1M about proposed HSR in Vietnam. Lots of issues and concerns raised. Obviously different location and Geography but made some quick comparisons. Vietnam: 1,541 km. Est cost $67 billion; population 102.2 million; per capita cost $655.72 Canada: 1000 km. Est cost $90...
  4. M

    Alto High Speed Rail

    The 100,000 that died since 2018 have no time but I guess by your standard they are not real people anymore. As for redirecting funds it is that simple Just cancel this ridiculous project. Nobody cares about emissions anymore except a small few in Canada and when I say nobody cares I mean the...
  5. M

    Alto High Speed Rail

    While not exactly as I indicated above 23,746 patients died in Canada while waiting for surgeries or diagnostic procedures between April 2024 and 2025 bringing the total upto 100,000 since 2018. (CTV.news) So please explain to me why you disagree. High speed rail is more important than 100,000...
  6. M

    Alto High Speed Rail

    I generally like to just post photos and state facts about projects without expressing opinions as I find most people do not like what I have to say. Most recently I had a post deleted from SSP. So here it goes against my better judgement. With people dieing in ER waiting rooms, lining up at...
  7. M

    797 Richmond Road l Dentech Holdings Inc. l 32 m. l 9 s. l Chmiel Archetects

    Based on construction progress so far I am doubting if a utility pipe was ever encroaching.in the hole. This project is now called Aurora Apartments as seen on the banner..
  8. M

    1047 Richmond Rd | 112+121m | 36+38s | Fengate | RLA

    2nd Tower Crane up.
  9. M

    1047 Richmond Rd | 112+121m | 36+38s | Fengate | RLA

    Easterly Tower Crane went up today and is nicely adorned with blue lights. The westerly crane was started.
  10. M

    Junction Central | 25 Pickering Pl. | 52m+94m | 15s+29s | Colonnade BridgePort+Fiera | Hobin Architecture

    Thanks to senior Sunday's on OC Transpo I rode out to the east end to take a couple of photographs.
  11. M

    Ryse | 1950 Scott | 72m | 22s | Colonnade Bridgeport | Hobin

    Ground floor now completed. Concrete columns being formed and poured.
  12. M

    The Westmount | 398-406 Roosevelt Ave. | 21m | 6s | ML DEVCO | RLA

    Final cladding being installed on the East side Street Frontage. West and South sides mostly complete. Did not verify the north side.
  13. M

    1047 Richmond Rd | 112+121m | 36+38s | Fengate | RLA

    Two Tower Crane bases installed waiting for concrete pour. The East Crane base was being covered with orange tarp so pour may have already been completed. Could not tell from the site line.