News   GLOBAL  |  Apr 02, 2020
 5.8K     0 
News   GLOBAL  |  Apr 01, 2020
 29K     0 
News   GLOBAL  |  Apr 01, 2020
 2.8K     0 

  1. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    The last? CIBC logo was installed on the south tower. The placement of twelve large, structural steel nodes atop the Level 3 core is complete. Excavation of the last few footings continues on P5.
  2. M

    Toronto | 75 on The Esplanade | 99.97m | 29s | Harhay | a—A

    It looks like the insulation has been delivered. Maybe things will be completed soon? :) How long has it been? At least 8 months since the canopy supports have been installed. I can’t recall when the mechanical room cladding was “almost” completed. Probably similar timing. Hard to believe they...
  3. M

    Toronto | St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    I thought this was a green roof? Not sure where I read or when I dreamt about that. We shall soon see.
  4. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    It’s getting a little crowded
  5. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    The forms jumped one more level.
  6. M

    Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The generator was running tonight so I assume it was running all day today. Maybe they are working on the transfer switch. That could be a long lead time item and explain the parked generator.
  7. M

    Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    Good work! Thanks!!! Ironically, the generator was running this morning which I assume was for a regular test. Continuing the irony, there were three Toronto Hydro trucks on the street too. So I asked one worker if they were there for the generator. Replied; “What generator? No! “ Maybe I...
  8. M

    Toronto | St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    I’m curious as to how they are going to finish the green roof. Edit: note to self - remember to use mechanical shutter next time. 😀
  9. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    I’m guessing the east side top wall could be coming down soon or maybe all of it? Checking daily. The glass angles should start providing some interesting reflections in the next few weeks and months ahead.
  10. M

    St Lawrence Market

    Pictures from Tuesday Aug 2.
  11. M

    St Lawrence Market

    Wow, such detail without all the fluff. I don’t care if it happens like this but at least we know they have a plan. It sounds promising.
  12. M

    Toronto | Union Park | 303.26m | 58s | Oxford Properties | Pelli Clarke Pelli

    Isn’t this so communication signals are not blocked, as much? I can pick up all the Buffalo TV stations from my condo digital tv antenna at ~100m but have problems with CTV bouncing off the CN tower to the east at times.
  13. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Two new steel supports installed! How exciting. New CIBC sign being installed on the east side of phase 1 this morning. Pictures from last night and this morning. Almost ready for a jump up a floor. Possible new crane base prep at the east edge under the stop light? One more crane...

Top