News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.3K     0 

  1. NotACop123

    Toronto Toronto | 280 Viewmount | 113m | 33s | Altree | Graziani + Corazza

    This Pizza Nova will be relocating 831 Glencairn Ave. (aka the Dylan) based on the signage already up at the new location.
  2. NotACop123

    Toronto Toronto | 262-274 Viewmount Avenue | 128.91m | 38s | Chestnut Hill | Kirkor

    Thanks Northern Light. Looks like the 250 Viewmount post is the mistake.
  3. NotACop123

    Toronto Toronto | 8-12 Benner Avenue | 122.08m | 37s | DBS | BDP Quadrangle

    That first rendered image is quite sneaky because it removes the fencing and trees that abut Allen Road making it seem more open and calm
  4. NotACop123

    Toronto Toronto | 262-274 Viewmount Avenue | 128.91m | 38s | Chestnut Hill | Kirkor

    Are you sure these are the right renders? You posted these exact photos for 250 Viewmount as well.
  5. NotACop123

    Finch West Line 6 LRT

    From the article: “There are still additional steps that need to be taken after this phase to ensure the line is safe and reliable before opening - including a bedding in period to further test the system and independent certification.” So much for RSD being the final testing phase.
  6. NotACop123

    Sheppard Line 4 Subway Extension (Proposed)

    A little besides the point but that 2010 map is wrong, it mistakenly includes Downsview Park which only opened in 2017 (also incorrectly calling it Downsview and Downsview as Sheppard West which it was not then known as)
  7. NotACop123

    Toronto Toronto | 351-377 Marlee Avenue | 126.1m | 39s | RGC | Graziani + Corazza

    That plaza is one of the worst along Marlee and that’s saying something. Good riddance that the sketchy spa and weird cafe (the store front with just a black sign)
  8. NotACop123

    Toronto Toronto | 699 Lawrence West | 128.56m | 38s | Midtown West Residences | Core Architects

    I'm curious what will happen to the lot across the street from the PetroCanada, that used to be an Esso/Husky but it has been dormant for ages. I believe the fencing just says "Option Construction" and has so for years.
  9. NotACop123

    Toronto Toronto | The Dylan | 35.7m | 10s | Chestnut Hill | Kirkor

    Still no hints of who the retail tenant(s) will be :|
  10. NotACop123

    Toronto Toronto | 726-736 Marlee Avenue | 87.7m | 26s | Trinity Point | BDP Quadrangle

    Personally I think this project would be much better if it were just the podium
  11. NotACop123

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Buying brand new, especially for a second car, is always financially irresponsible.
  12. NotACop123

    TTC: Easier Access Phase III

    Glencairn Station Elevator 1/1/2024
  13. NotACop123

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Don't jinx it, nothing is 100% confirmed.

Back
Top