News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. S

    Toronto Toronto | Grand Central Mimico | ?m | 37s | VANDYK | Kohn

    They paid around 30million for the small pie shaped lot next to the cemetery and GO station, which has existing foundations and P levels from previous owner..so not surprised to see they have issues with $. Overextended/too ambitious
  2. S

    Toronto Toronto | Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    To me it seems like it must have been hooked onto the crane swinging outside of the building when it fell. If it rolled off the building i think it would hit the green netting a few floors below and taken that out too.
  3. S

    Toronto Toronto | Maverick | 154.53m | 49s | Empire | Arcadis

    Yes those are heating cables, they will be covered with pinned insulation against the concrete. The soffit will be a cold space, cables turn on via thermostat. Not necessarily a "heated floor" above, but there to make sure you dont feel the cold during winter. Here the concrete is what 5-6 feet...
  4. S

    Toronto Toronto | Eau du Soleil Condos | 227.98m | 66s | Empire | Richmond Architects

    There are 6 elevators for the taller building (3 low rise only up to mid point, 3 high rise up to 66 - with priority dispatch software), 4 elevators in shorter building, plus 2 per tower serving up to 7th floor for podium suites. Total 14 elevators for residents. Under 100 suites per cab.
  5. S

    Toronto Scenic On Eglinton | ?m | 18s | Aspen Ridge | P + S / IBI

    Only thing is this building will have 6 underground levels. The have to dig down another 15m with probably a total of 3 tieback levels. Cant see the footings starting until dec/jan. Topping off will probably be around feb/mar 2015.
  6. S

    Toronto Scenic On Eglinton | ?m | 18s | Aspen Ridge | P + S / IBI

    Jul/24/13 Excavation and lagging well under way at Scenic 3.

Back
Top