News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. G

    Toronto Toronto | Curio Condos on the Queensway | 37m | 10s | Marlin Spring | Graziani + Corazza

    Sales team sent out an email blast this morning advising that an event held on site this Saturday "is your last chance to visit the Sales Centre before demolition". Looks like this one is getting started soon.
  2. G

    Toronto Toronto | Thirty Six Zorra Condominiums | 113.68m | 35s | Altree | Graziani + Corazza

    I'm fairly certain this one is now topping out.
  3. G

    Toronto Toronto | Kazmir Condos | 28.95m | 8s | Lormel Homes | RAW Design

    Demolition of the existing building has begun. It appears that interior elements are being removed first, as the rear of the building (parking lot area) is littered with piled debris. Sidewalk protection for the sidewalk along the north side of Queensway has also started to be put in place.
  4. G

    Toronto Toronto | 522 Royal York | 124.25m | 37s | Queenscorp | Turner Fleischer

    The development app for this has disappeared...
  5. G

    Toronto Toronto | 522 Royal York | 124.25m | 37s | Queenscorp | Turner Fleischer

    This seems a little over-dense for the area, although a good spot for new development. It would tie the density along Queensway to that going up around Mimico.
  6. G

    Toronto Toronto | The Tailor | 38.6m | 10s | Marlin Spring | Graziani + Corazza

    This project seems to be progressing at a snails pace, especially when compared to Thirty Six Zorra directly behind it.
  7. G

    Toronto Toronto | Kazmir Condos | 28.95m | 8s | Lormel Homes | RAW Design

    The intensification in this area is quite staggering, especially when compared to 10 years or so ago. The property directly across Chartwell Road is being sold off for redevelopment. Link It seem to theorize a six floor 47 unit condo with retail at grade.
  8. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    They are making quick work here. The building to the extreme west end of the site (former Scotiabank branch) is already 50% demolished.
  9. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    Both the east and west portions of the site have been fenced off with construction fencing. Two large backhoes and some other equipment are on site for demolition.
  10. G

    Toronto Toronto | Reina Condos | 30.95m | 9s | Urban Capital | BDP Quadrangle

    Site is fenced off. Interior of the sales center has been removed. Looks like excavation is about to start.
  11. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    Walked by the site this afternoon. The final of the four freestanding buildings to be demolished, which was the Milestones restaurant to the East side of the site, has now closed. Fixtures were also being removed and loaded into a truck.
  12. G

    Toronto Toronto | Joya Condos | 42.6m | 12s | Marlin Spring | Graziani + Corazza

    I walked by the site this evening. The current small "mobile home" type building on the eastern portion of the site has had its exterior painted and it's clear the interior is being finished as a sales centre/office with MS logos and building renderings in various stages of attachment. A...
  13. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    The Montana's has now closed and had its signage removed. Looks like Milestones is still open presently.
  14. G

    Toronto Toronto | BLVD Q | 43.05m | 10s | Mattamy Homes | TACT Architecture

    I have what is perhaps a bit of a silly question here, for some of the more knowledgeable forum members. These renderings seem to show a 5-6 story building at 929 The Queensway (the area directly on the South West corner of the Canmotor and Queensway intersection), where there is currently a one...
  15. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    As of last night, the Kelsey's (restaurant on the western portion of site) has a sign on it's door advising it has closed. I'd think that, now that both of the buildings on that side are empty (Kelsey's and the Scotiabank), construction for phase one starts imminently. The two restaurants on the...
  16. G

    Toronto Toronto | Curio Condos on the Queensway | 37m | 10s | Marlin Spring | Graziani + Corazza

    The existing building has been painted/wrapped dark blue (looks almost black). Project's name is "Curio Condos on The Queensway". Here's the website https://curiocondos.com.
  17. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    I suspected as much. Someone confirmed it to you? Any specific date(s) you've heard?
  18. G

    Toronto Toronto | Verge Condominiums | 60.3m | 17s | RioCan Living | Turner Fleischer

    The Scotiabank has moved to a new location across the street. Looks like the start of demolition may be soonish.
  19. G

    859 The Queensway (First Avenue) - Real Estate -

    Construction seems to have properly resumed now.

Back
Top