My mistake, there were two; Hayter and Buchanan. http://jpeg2000.eloquent-systems.com/toronto.html?image=goads_atlas/1910_1923_v1/g1910_1923_pl0015.jp2
Is Metrolinx planning on selling off the remaining surface lots for redevelopment once the garage is complete, or retaining them as they have done at other stations?
This 2016 report explains that the developer offered to sell the City the land instead of going ahead with the appeal. http://www.toronto.ca/legdocs/mmis/2016/gm/bgrd/backgroundfile-97095.pdf
I actually disagree with the fact that the 100 will begin at Winston Churchill Transitway station. It would make much more sense if it began in area where people could actually access the route, preferably Erin Mills Town Centre Area, which is a growth node that has been stripped of its express...
Rezoning application filed:
1197 THE QUEENSWAY
Ward 05 - Etob. York District
Proposal to construct a 12 storey mixed-use building containing 159 dwelling units and a total gfa of 13,110 square metres. The proposal provides 347 square metres of retail at grade as well as 3 levels of underground...
Just checked design review panel presentation from July: 2 levels of underground parking. So unfortunately it will be a while until we start to see this one take shape.
It will certainly be a hike to Kipling, but it is possible the Dundas BRT could get built long before any extension of Line 2 and a stop is planned at East Mall.
Heights should transition down away from the transit station. The two high rise towers on the extreme west of the property are out of place and also a 500m walk to Don Mills and Eglinton.
By now everyone knows the story of how Lawrence East and Kirby were approved. Even though Concord is in the City of Vaughan it is not in the riding of Vaughan which is represented by the Minister.