News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    On behalf of the Owner, Ferncastle (Front Street) Inc., the project has not revised its excavating and shoring - caisson plan other than for a slight modification to same along the westerly (Yonge Street) edge of the property due to an improperly mapped Toronto Hydro concrete duct which...
  2. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    Shoring will start within a few days and excavation will follow.
  3. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    L Tower Construction Progress Photos http://cityzen.posterous.com/photographs-of-the-l-tower-construction-site
  4. Cityzen

    London on the Esplanade Condos (Cityzen) - Real Estate -

    yyz, please send me a direct message with your friend's name and suite number and we will investigate these issues.
  5. Cityzen

    London on the Esplanade Condos (Cityzen) - Real Estate -

    Sally7, please send me a direct message with your name and suite number and i will look into this.
  6. Cityzen

    London on the Esplanade Condos (Cityzen) - Real Estate -

    Masin, please provide us with your suite number and we will have the problem investigated immediately. Notify your customer care representative as well.
  7. Cityzen

    Toronto Toronto | London On The Esplanade Condos | 102.1m | 33s | Cityzen | Burka

    The entire canopy will be painted once the weather warms, and finally the glass will be installed. The concrete bases and bolts will be covered by metal.
  8. Cityzen

    Toronto Toronto | Waterlink at Pier 27 | 43.89m | 14s | Cityzen | a—A

    Phase 1 & 2 are being built at the same time. The building flanking Redpath is designed with a single loaded corridor thereby providing sound attenuation.
  9. Cityzen

    Toronto Toronto | Aria | ?m | 19s | Fernbrook Homes | Rafael + Bigauskas

    We are pleased to report the following with respect to Aria Phase One; *Precast has started and will be at full force on Monday December 7th *Windows will follow precast installation, weather permitting starting January 12th, 2010
  10. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The limestone is being reclaimed but will not be reused in the construction of the new tower.
  11. Cityzen

    Oakville Toronto | The Shores | ?m | 10s | Fernbrook Homes | P + S / IBI

    The Shores Groundbreaking http://www.youtube.com/user/CityzenGroup#p/a/u/1/3OXaOrB5_ok We are pleased to report that construction is underway. Part of the sales office is being torn down (model suite) to facilitate construction.
  12. Cityzen

    Mississauga Toronto | Absolute World | 169.77m | 56s | Cityzen | MAD architects

    Absolute 4 / building D: 178.300 m including mechanical penthouse Absolute 5 / building E: 159.990 m including mechanical penthouse Absolute 4 – 56 storeys Absolute 5 – 50 storeys MARK ZWICKER Project Architect B.ARCH., O.A.A., LEEDap
  13. Cityzen

    Mississauga Toronto | Absolute World | 169.77m | 56s | Cityzen | MAD architects

    This is the system being used at Absolute; http://www.peri-usa.com/products.cfm/fuseaction/showproduct/product_ID/252/app_id/6.cfm
  14. Cityzen

    Toronto Toronto | Waterlink at Pier 27 | 43.89m | 14s | Cityzen | a—A

    There are no plans to launch Phase 3 at this time.
  15. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The rendering at the groundbreaking was work in progress, yes the "boot" had been eliminated but it left curves at the bottom of the residential building. The version we posted last evening is the correct one. We authorized Spine3D to make available a high-res image to post at UT.
  16. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    L Tower Image This is the revised rendering.
  17. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    L Tower Groundbreaking October 21, 2009 Over 400 people attended the L Tower Groundbreaking on Wednesday.
  18. Cityzen

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    Dear Editor Dear Editor Christopher Hume: Architectural jewel goes straight to L – October 16th, 2009 Despite previous attempts to correct inept and misleading reporting, Star critic Chris Hume insists Libeskind’s uniquely sculptured tower design beside the Sony Centre is “atop the...
  19. Cityzen

    Toronto Toronto | Waterlink at Pier 27 | 43.89m | 14s | Cityzen | a—A

    Pier 27 We are pleased to announce that Deep Foundations has mobilized on site.

Back
Top