They have poured the 31st floor slab and columns going up to 32nd. 32nd is the mechanical penthouse floor, then there is a multi elevation roof slab which will be 4 concrete slabs and 1 steel slab.
So basically for the stepping/curved side there is the 32nd slab, roof slab (33rd), and high...